Capacity factor: 46 %

A LoWind Turbine TN535 built under licence by Tozzi Nord S.r.l. in Italy produced in the duration test needed for the MCS certification more than 40'000 Kwh in one year. This is a capacity factor of 46 %. The machine is installed in the test field of GL Garrad Hassan in Kaiser-Wilhelm-Koog, Northern Germany.